Serving Pueblo and Colorado Springs Certified asbestos abatement · Open Monday to Friday, 7 a.m. to 5 p.m.
Pueblo & Colorado Springs

Selective Demolition

Interior demolition for homes and businesses in Pueblo and Colorado Springs. The parts your project needs gone come out, and the rest of the building stays standing.

  • Homes and businesses
  • Asbestos checked first
Selective demolition inside a gutted commercial building: an elevator shaft half knocked down, with a crew member in a hard hat and respirator
CDPHE-certified asbestos abatement contractor
Independent asbestos inspection
Homes and businesses

Selective demolition means removing part of a building, not all of it. A dated kitchen, a bathroom or an old office layout comes out, and the frame, roof and foundation stay. It's usually the first step of a remodel. Cyclone Kleen Up does selective demolition for homes and businesses in Pueblo and Colorado Springs. Our shop is in Pueblo West.

Asbestos first. In an older building, an independent certified inspector checks the materials the work will disturb before anything comes out. Colorado requires that inspector to be independent of the company doing the removal, so we don't test our own jobs. If the work will disturb asbestos over the state's limits, it comes out first. We're a state-certified asbestos abatement contractor, and our own crews do the demolition too, so the asbestos abatement and the demolition go through one company.

Two-storey home interior stripped to the studs during selective demolition, with the old stair in front

Interior demolition for homes

A kitchen or bath remodel starts with tear-out: cabinets, counters, old flooring, a wall that's in the way. Selective demolition takes out what your remodel plan calls for and leaves the rest in place.

Older homes need a check first. More than half of Pueblo's homes went up before 1970. Close to 40% of Colorado Springs homes date from before 1980 (Census Bureau figures for 2020 to 2024). Houses that old can have asbestos in floor tile, ceiling texture and pipe wrap.

Lead paint is a separate rule. EPA says about three in four U.S. homes built before 1978 still have some lead-based paint. Its renovation rule covers taking out walls and ceilings in those homes. Colorado also requires a lead pamphlet for the owner when the work disturbs more than 2 square feet of paint in a room (Regulation No. 19, Part B). EPA warns that any renovation, repair or painting project in a pre-1978 home or building that has lead-based paint "can easily create dangerous lead dust." Cyclone Kleen Up is an EPA Lead-Safe (RRP) certified firm.

Commercial floor left wrecked, with bent metal studs, a fallen ceiling grid and debris everywhere

Interior demolition for businesses

Tenant improvements, remodels and building turnovers all start with clearing the space. That can mean non-load-bearing walls, drop ceilings, flooring, fixtures and old built-ins.

EPA's lead renovation rule reaches some businesses too. It covers "child-occupied facilities" built before 1978, such as "day care centers, preschools and kindergarten classrooms" (40 CFR 745.83).

We've worked on commercial sites in both cities. In Colorado Springs, we removed the asbestos from buildings for IBEW and for Equity Group so the buildings could be demolished. In Pueblo, we removed VCT floor tile and ceiling tiles from a D-60 school for Nunn Construction, with a ride-on floor scraper doing the floors.

If the business stays open during the work, Cyclone works around it, with hard barriers separating the work area from the rest of the space.

Why Cyclone Kleen Up

Asbestos and demolition through one company

If the work will disturb asbestos over the state's limits, we abate it first, and our own crews handle the strip-out on the same job. You don't have to hire a second company and line up two schedules.

An independent inspector, by law

The person who checks for asbestos doesn't work for us. Colorado's rule keeps testing and removal apart, so the inspector has no stake in what they find.

Local jobs with dates

Two Colorado Springs buildings cleared for demolition, each with the month, the year and what came out.

A straightforward estimate

Call us, and most estimates are done over the phone.

How it works

How interior demolition works

  1. 1
    Estimate

    The estimate covers what's coming out and whether any of it holds the building up. Stripping finishes counts as renovation under Colorado's asbestos rule. Removing a load-bearing wall counts as demolishing part of the building, which can mean a state notice. CDPHE can confirm for your job.

  2. 2
    Asbestos inspection

    An independent certified inspector checks the materials the work will disturb. For a building put up after October 12, 1988, the building's architect or project engineer, or a certified asbestos inspector, can sign a state form instead. CDPHE still recommends inspecting every building. Asbestos over the state's limits that the work will disturb comes out first.

  3. 3
    Utilities off

    Power, gas, water and sewer lines get shut off, capped or otherwise controlled before the tear-out starts, and the utility is told ahead of time (OSHA, 29 CFR 1926.850). Cyclone arranges the gas and electric disconnects.

  4. 4
    Tear-out

    The parts on the plan come out. Machines go only on floors strong enough to hold them, as OSHA's rule requires.

  5. 5
    Haul-off and cleanup

    Asbestos waste goes only to an approved landfill. Cyclone recycles concrete and metal when it can. The crew finishes with HEPA vacuuming.

Jobs we've done ahead of demolition

Crew member in a protective suit inside a plastic-lined block corridor, removing asbestos-containing block filler at the IBEW building, Colorado Springs
Colorado Springs · April 2022

IBEW

IBEW, a repeat customer, needed its building abated before a full demolition. The asbestos was in the CMU block filler and the drywall. We stripped the block filler with our hydro media blaster and took out the drywall. We finished on schedule, and the building was cleared to come down. IBEW job details

Building wrapped in plastic sheeting and scaffolding for asbestos abatement for Equity Group, with the Cyclone Kleen Up truck in front, Colorado Springs
Colorado Springs · August 2019

Equity Group

Equity Group redevelops land: it buys properties, clears the old buildings and brings in new businesses. This repeat customer has hired us for several large abatements. This one covered more than 15,000 square feet, done on time so the demolition could go ahead. Equity Group job details

Costs

What selective demolition costs

Call for pricing. These things change the price:

  • How much comes out. More walls, ceilings and flooring mean more labor and more debris.
  • Structural or not. Removing a load-bearing wall can bring in a state notice and a local permit. Stripping finishes usually needs less paperwork.
  • Asbestos or lead. Asbestos over the state's limits that the work will disturb has to be abated first. In a home built before 1978, lead-safe work rules apply.
  • Open or empty. A space that stays in use takes more planning than an empty one.
  • Disposal. The amount and type of debris set the haul-off cost. Asbestos waste can only go to an approved landfill.
  • Permits. Each city has its own permit office and fees (see the FAQ).
Service area

Where we do selective demolition

We take interior demolition jobs across Pueblo, Colorado Springs and nearby towns. Crews leave from our Pueblo West shop, which is about 40 miles from Colorado Springs.

PuebloSelective demolition in Pueblo
Colorado SpringsSelective demolition in Colorado Springs
25 Colorado Springs Pueblo
FAQ

Selective demolition questions

Still have a question?

Call and talk it through. Most estimates are done over the phone.

Call 719-299-3887

Selective demolition is taking out part of a building, such as walls, ceilings, floors, cabinets or fixtures, while the structure stays up. It's also called interior demolition or a strip-out. Under Colorado's asbestos rule, stripping finishes counts as renovation. Removing a part that holds the building up counts as demolition. Tearing down a whole building is a bigger job, with a state demolition notice and a wrecking permit. Cyclone does both.

In most cases, yes. Colorado requires suspect material to be inspected, or treated as asbestos, before work disturbs more than 32 square feet or 50 linear feet of it in a single-family home. Other buildings have higher amounts: 160 square feet or 260 linear feet (Regulation No. 8, Part B). An independent certified inspector does the check. For a building put up after October 12, 1988, the architect or project engineer, or a certified asbestos inspector, can sign a state form instead. CDPHE still recommends inspecting every building. See asbestos testing.

Yes, if the home was built before 1978. EPA's lead renovation rule covers removing walls, ceilings, plumbing and windows in those homes, and EPA, not the state, runs that rule in Colorado. Colorado adds its own pamphlet rule for work that disturbs more than 2 square feet of paint in a room.

It depends on where the building is. Colorado Springs permits come from the Pikes Peak Regional Building Department (PPRBD). It requires a wrecking permit only for a whole building, but interior work may need its own permit. In the City of Pueblo, permits come from the Southern Colorado Building Department, which treats interior wall removal as an alteration. Since January 2026, the rest of Pueblo County goes through the county's own Building Division, which requires a permit to remove any part of a structure. Depending on the job, Cyclone can pull the permit.

Asbestos waste must go to a landfill approved for it, whatever the amount (CDPHE). Clean concrete, asphalt and scrap metal can go to recyclers, and both counties list them in their recycling guides. Concrete with asbestos floor tile or glue stuck to it can't be recycled.

It depends on the size of the job and on the paperwork. If the state demolition notice applies, it must be filed 10 working days or more before the job begins (Regulation No. 8, Part B, III.E). Ask for a timeline when you call for an estimate.

Ready for an estimate?

Tell us about the job and we’ll walk you through the next steps.

Call 719-299-3887
Rather talk it through?719-299-3887 Call now
  • Open Monday to Friday, 7 a.m. to 5 p.m.
  • Homes and businesses
  • Pueblo, Colorado Springs and nearby towns
or send a request

Request a quote

We’ll call you back to talk through the job.

What do you need?

We call back Monday to Friday, between 7 a.m. and 5 p.m.

Call 719-299-3887Get an estimate