
IBEW
A repeat customer. Asbestos-containing block filler and drywall had to come out before the building could come down, and a hydro media blaster stripped the filler off the block. The building was ready for demolition on schedule. Job details
Commercial restoration, for Cyclone Kleen Up, starts with getting a building ready for renovation, a tenant fit-out or demolition. Our commercial jobs on record in Pueblo and Colorado Springs are asbestos abatement and floor removal ahead of construction. We're a CDPHE-certified asbestos abatement contractor and an IICRC Certified Firm, working from a shop in Pueblo West.
A commercial building project, whether it's a renovation, a tenant build-out or a full teardown, usually has to deal with what's already in the walls, floors and ceilings before new work can start. In older buildings that often means asbestos in flooring, ceiling tile, pipe wrap or drywall joint compound. Commercial disaster restoration after a fire, flood or wildfire is covered under disaster restoration.
Colorado requires the asbestos inspector to be independent of the company doing the removal (Regulation No. 8, Part B, III.A.1.e). We don't test our own jobs. An independent certified inspector surveys the building, we do the removal, and an independent air monitoring specialist does the clearance test.
Cyclone works in occupied buildings and open businesses, with hard barriers separating the work area from occupied space.
What we handle: Asbestos abatement · Selective demolition · Floor scraping · Media blasting · Industries we serve · Schools
Certificate 26153 is on CDPHE's dashboard, so a property manager can check it in a minute.
Two in Colorado Springs, two in Pueblo, each with a date and a scope you can read.
Colorado requires the inspector to be independent of the abatement company, and the clearance test is done by an independent specialist.
The estimate gives you both before any work is scheduled.
Before work that could disturb asbestos, an independent certified inspector surveys the building. Owners have a duty under OSHA to find out where asbestos is before construction work begins (29 CFR 1926.1101(k)(2)(i)).
OSHA requires the building owner to tell bidding contractors, their own employees, other employers on site and any tenants who will occupy the affected areas (1926.1101(k)(2)(ii)).
Above Colorado's trigger amounts, or for any demolition, CDPHE needs at least 10 working days' notice before work starts.
We seal the work area, keep it under negative air pressure, wet the material, and remove and bag it.
An independent certified air monitoring specialist tests the air before the containment comes down.
The waste goes to an approved disposal site, as the state requires for any amount.
Past customers include the City of Pueblo, Pueblo Housing Authority and Pueblo County.

A repeat customer. Asbestos-containing block filler and drywall had to come out before the building could come down, and a hydro media blaster stripped the filler off the block. The building was ready for demolition on schedule. Job details

Equity Group buys older commercial properties to tear down and redevelop, and this was one of several large abatement jobs we've done for them: more than 15,000 square feet of asbestos removed, on schedule, cleared for demolition. Job details

The district replaced its heating and cooling system, and we abated the ceiling first, over Christmas break. Job details

Old vinyl composition tile and the ceiling tile above it came out at a D-60 school with a ride-on floor scraper we'd just bought, work planned across the summers of 2022 and 2023. Job details
Every job is priced after an estimate. Call for pricing.
Does business insurance cover the downtime? Colorado's Division of Insurance uses asbestos as an example of what business interruption cover can apply to: when "asbestos is discovered during a remodel, and must be removed before employees can return to work." Flood is generally a separate policy. For tenants, DOI says "Businesses that lease or rent property must insure their own interests, including improvements to the property and contents." Check your policy and ask your agent.
Commercial jobs in Pueblo, Colorado Springs and nearby towns run from Pueblo West, about 40 miles from Colorado Springs.
Call and talk it through. Most estimates are done over the phone.
Call 719-299-3887Above Colorado's trigger amounts, yes, by an independent certified inspector. OSHA also puts the duty on the building owner to find out where asbestos is before construction work starts (29 CFR 1926.1101(k)(2)(i)).
At least 10 working days above the trigger amounts, and always before a demolition.
Yes. The D70 ceiling job was done over Christmas break, and the D-60 floor work was planned over the summer.
Check your policy. Colorado's Division of Insurance notes that business interruption cover can apply when asbestos discovered during a remodel has to be removed before employees return to work. It's not a guarantee; your policy sets the terms.
Look up General Abatement Contractor No. 26153 on CDPHE's contractor list.
Tell us about the job and we’ll walk you through the next steps.
Call 719-299-3887