Serving Pueblo and Colorado Springs Certified asbestos abatement · Open Monday to Friday, 7 a.m. to 5 p.m.

Industries We Serve

A school, a clinic and a church in Pueblo or Colorado Springs each answer to different rules before a ceiling or floor comes out. Cyclone Kleen Up, based in Pueblo West, is a state-certified asbestos abatement contractor (CDPHE No. 26153). Cyclone has worked in schools, commercial buildings, health care facilities, assisted living facilities and places of worship.

State-certified asbestos contractor, No. 26153
Residential and commercial
EPA Lead-Safe (RRP) certified

Schools and school districts

Colorado draws its asbestos line much lower in a school. Past 3 linear feet of pipe or 3 square feet of other material, everyone doing, supervising or designing the abatement needs a state certificate (Regulation No. 8, Part B, III.B.3). Under AHERA, the district's designated person does the final inspection. That person also takes the clearance air samples (40 CFR 763.90(i)).

We have two Pueblo school jobs on record. For D70 in December 2021, we abated a ceiling over Christmas break so the HVAC system could be replaced. At a D-60 school, floor and ceiling tile removal was planned for the summers of 2022 and 2023. Asbestos abatement for schools has both.

Questions about your property?Call and talk it through. Most estimates are done over the phone.
719-299-3887

Commercial buildings

Our two Colorado Springs commercial jobs were buildings abated so they could be torn down. For IBEW in April 2022, we abated CMU block filler and drywall, using a hydro media blaster. The building was cleared for full demolition. For Equity Group, a repeat customer, we abated over 15,000 square feet of asbestos in August 2019.

Before work starts, the building owner has to find out where the asbestos is. Asbestos at work covers what OSHA expects of owners and employers. Our commercial work is on commercial restoration.

Health care buildings

In a hospital or clinic, CDC's guideline has the facility plan for dust and moisture before repair work starts. CDC calls this an infection control risk assessment (ICRA), "conducted before initiating repairs, demolition, construction, or renovation activities." The facility's team runs it, with its infection control staff. The contractor works to it.

CDC lists work that needs barriers in a health care building. The list includes tearing out ceiling tiles, taking up flooring and carpeting, and repairing water damage. CDC also says wet wallboard, carpet and other absorbent material should come out if it can't be cleaned and dried within 72 hours. Cyclone has worked in health care facilities, with hard barriers separating the work area. See health care facilities.

Assisted living and senior housing

Colorado's assisted living rule (6 CCR 1011-1, Chapter 7) adds duties other buildings don't have. If part of the building can't be lived in, the residence "shall notify the Department within 48 hours if the relocation of one or more residents occurs" (Part 5.2).

A repair can also become a "renovation" under the rule. That includes moving walls or upgrading major systems such as heating and ventilation (Part 2.53). A renovation needs a state guideline compliance review before residents use the space (Chapter 2, Part 3.3.1). The residence's infection control policies must rest on national guidelines such as CDC's (Part 19.2). Cyclone has worked in assisted living facilities, with hard barriers separating the work area. See assisted living. An operator planning a project can call us about an estimate. Check the review question with CDPHE.

Churches and places of worship

For asbestos, Colorado counts a church as a "Public and Commercial Building." The rule defines that as "any facility, which is not a school building" (Regulation No. 8, Part B, I.B.90). So a church follows the amounts for other buildings, not the lower ones for a single-family home. Asbestos abatement lists both sets and when a permit is needed.

A church-run K-12 school is the exception: it falls under AHERA and the 3 square foot school rule. For older church buildings, the National Park Service notes that "Uncontrolled moisture is the most prevalent cause of deterioration in older and historic buildings." Cyclone has worked at religious facilities. See religious facilities. A congregation with a project in mind can call us to talk through the building.

What to have ready before a project

  • An asbestos inspection by an independent certified inspector, before the work disturbs building materials. Asbestos testing explains who may do it.
  • In a health care building, the facility's ICRA and any permit it issues for the work.
  • A call to your insurance agent. Colorado's Division of Insurance gives one example of an event business interruption cover can apply to: asbestos found during a remodel that must come out before employees return. Your policy decides.
Reviews

What our customers say

From our customer surveys, posted with each customer's permission.

“I would recommend this company to everyone”
Mike D.Colorado Springs, CO
“They did a nice job of getting in and out and keeping the process simple for our family.”
Tim R.Cañon City, CO
“Ramey runs a professional company. Her contractors did excellent work and they were on schedule. She was in constant contact with us keeping us informed step-by-step. She inspected all the work but the contractors did everything correct the 1st time. Highly professional....she did what she said they would do, at the quoted price and on time. What more can you ask? She is very pleasant to work with!”
John J.Westcliffe, CO
FAQ

Industries we serve questions

Still have a question?

Call and talk it through. Most estimates are done over the phone.

Call 719-299-3887

Our dated jobs are in schools and commercial buildings; we've also worked in health care, assisted living and religious facilities. In Pueblo, we abated a ceiling for D70, and floor and ceiling tile removal was planned at a D-60 school. In Colorado Springs, we abated two commercial buildings for IBEW and Equity Group so they could be demolished.

The facility does. CDC tells health care facilities to set up a team with infection control staff to coordinate building projects. The team does the assessment before the project gets underway. A contractor follows the measures the facility sets. We don't write ICRAs.

Yes. When residents are moved because part of the residence became unfit to live in, Colorado gives the residence 48 hours to notify the state health department (6 CCR 1011-1, Chapter 7, Part 5.2).

Yes, unless the building is a school. Colorado's rule puts every facility that isn't a school building in its "Public and Commercial Building" group. A sanctuary or fellowship hall uses the amounts for other buildings. A church-run K-12 school follows the school rules.

Ready for an estimate?

Tell us about the job and we’ll walk you through the next steps.

Call 719-299-3887
Rather talk it through?719-299-3887 Call now
  • Open Monday to Friday, 7 a.m. to 5 p.m.
  • Homes and businesses
  • Pueblo, Colorado Springs and nearby towns
or send a request

Request a quote

We’ll call you back to talk through the job.

What do you need?

We call back Monday to Friday, between 7 a.m. and 5 p.m.

Call 719-299-3887Get an estimate